One 165 MW (ISO Conditions) General Electric 7FA gas turbine, one 100 MW Siemens Steam Turbine
Originally a cogeneration facility, steam host is on indefinite shutdown
Two natural gas and landfill gas-fired auxiliary boilers can supply up to 350,000 pounds per hour of process steam to the adjacent idled host as needed
Energy output is fully contracted with Ontario Power Authority to 2035