Equipment for base load is three 22 MW General Electric LM 2500 gas-fired turbines with heat recovery steam generators and two (one 20 MW and one 25 MW) steam turbine-generator sets
Equipment for peaker is one 30 MW General Electric LM2500 Plus gas turbine
Two PPAs with the IESO for dispatchable gas-fired generation – one for the combined-cycle plant to 2030 and one for the simple-cycle (‘Peaker’) plant to 2035.
Long term maintenance agreements with the gas turbine OEM