Northland Power is committed to accessibility and to compliance with all relevant Ontario laws, including the Accessibility for Ontarians with Disabilities Act, 2005. This includes providing information in an accessible format. Should you require a document in an accessible format, please write to accessibility@northlandpower.com or phone +1-416-962-6262.
Solar
Date | Title | PDF |
June 17, 2019 |
Amendment to Renewable Energy Approval |
|
Nov 16, 2018 |
Notice of Project Change |
|
Nov 16, 2018 |
Modification Document - Proposed On-Site Fuel Storage |
|
Mar 14, 2012 |
Renewable Energy Approval |
|
Mar 14, 2012 |
Renewable Energy Application Form |
|
Mar 2, 2012 |
Wellwater Monitoring Program |
|
Dec 15, 2011 |
Construction Plan Report - Rev 2 |
|
Dec 15, 2011 |
Decommissioning Plan Report - Rev 2 |
|
Dec 15, 2011 |
Design and Operations Report - Rev 2 |
|
Dec 15, 2011 |
Noise Assessment Report - Rev 2 |
|
Nov 23, 2011 |
Executive Summary |
|
Nov 23, 2011 |
Construction Plan Report |
|
Nov 23, 2011 |
Decommissioning Plan Report |
|
Nov 23, 2011 |
Design and Operations Report |
|
Nov 23, 2011 |
Natural Heritage Environmental Impact Study |
|
Nov 23, 2011 |
Natural Heritage Site Investigation Report |
|
Nov 23, 2011 |
Natural Heritage Records Review Report |
|
Nov 23, 2011 |
Natural Heritage Evaluation of Significance Report |
|
Nov 23, 2011 |
Noise Assessment Report |
|
Nov 23, 2011 |
Archaeological Assessment Report |
|
Nov 23, 2011 |
Water Body Records Review Report |
|
Nov 23, 2011 |
Water Body Site Investigation Report |
|
Nov 23, 2011 |
Water Body Environmental Impact Study |
|
Nov 23, 2011 |
Consultation Report - Main Report and Appendixes A-C |
|
Nov 23, 2011 |
Consultation Report - Appendixes D-J |
|
Nov 23, 2011 |
Project Description Report |
|
Mar 25, 2011 |
Draft Executive Summary - Rev 0 |
|
Mar 25, 2011 |
Draft Construction Plan Report - Rev 0 |
|
Mar 25, 2011 |
Draft Decommissioning Plan Report |
|
Mar 25, 2011 |
Draft Design and Operations Plan - Rev 0 |
|
Mar 25, 2011 |
Draft Natural Heritage Environmental Impact Study - Rev E |
|
Mar 25, 2011 |
Draft Natural Heritage Site Investigation Report - Rev E |
|
Mar 25, 2011 |
Draft Natural Heritage Records Review Report - Rev E |
|
Mar 25, 2011 |
Draft Natural Heritage Evaluation of Significance Report - Rev E |
|
Mar 25, 2011 |
Draft Noise Assessment - Rev 0 |
|
Mar 25, 2011 |
Draft Stage 1 and 2 - Archaeological Assessment Report |
|
Mar 25, 2011 |
Draft Water Body Records Review Report - Rev 0 |
|
Mar 25, 2011 |
Draft Water Body Site Investigation Report - Rev 0 |
|
Mar 25, 2011 |
Draft Water Body Environmental Impact Study - Rev 0 |
|
Date | Title | PDF |
June 17, 2019 |
Amendment to Renewable Energy Approval |
|
Nov 16, 2018 |
Notice of Project Change |
|
Nov 16, 2018 |
Modification Document – Proposed On-Site Fuel Storage |
|
Mar 14, 2012 |
Renewable Energy Approval |
|
Mar 14, 2012 |
Renewable Energy Application Form |
|
Mar 2, 2012 |
Wellwater Monitoring Program |
|
Dec 15, 2011 |
Construction Plan Report - Rev 2 |
|
Dec 15, 2011 |
Decommissioning Plan Report - Rev 2 |
|
Dec 15, 2011 |
Design and Operations Report - Rev 2 |
|
Dec 15, 2011 |
Noise Assessment Report - Rev 2 |
|
Nov 23, 2011 |
Executive Summary |
|
Nov 23, 2011 |
Construction Plan Report |
|
Nov 23, 2011 |
Decommissioning Plan Report |
|
Nov 23, 2011 |
Design and Operations Report |
|
Nov 23, 2011 |
Natural Heritage Environmental Impact Study |
|
Nov 23, 2011 |
Natural Heritage Site Investigation Report |
|
Nov 23, 2011 |
Natural Heritage Records Review Report |
|
Nov 23, 2011 |
Natural Heritage Evaluation of Significance Report |
|
Nov 23, 2011 |
Noise Assessment Report |
|
Nov 23, 2011 |
Stage 1 and 2 - Archaeological Assessment Report |
|
Nov 23, 2011 |
Water Body Records Review Report |
|
Nov 23, 2011 |
Water Body Site Investigation Report |
|
Nov 23, 2011 |
Water Body Environmental Impact Study |
|
Nov 23, 2011 |
Consultation Report - Main Report and Appendixes A-C |
|
Nov 23, 2011 |
Consultation Report - Appendixes D-J |
|
Nov 23, 2011 |
Project Description Report |
|
Mar 25, 2011 |
Draft Executive Summary - Rev 0 |
|
Mar 25, 2011 |
Draft Construction Plan Report - Rev 0 |
|
Mar 25, 2011 |
Draft Decommissioning Plan Report - Rev 0 |
|
Mar 25, 2011 |
Draft Design and Operations Plan - Rev 0 |
|
Mar 25, 2011 |
Draft Natural Heritage Environmental Impact Study - Rev 0 |
|
Mar 25, 2011 |
Draft Natural Heritage Site Investigation Report - Rev 0 |
|
Mar 25, 2011 |
Draft Natural Heritage Records Review Report - Rev 0 |
|
Mar 25, 2011 |
Draft Natural Heritage Evaluation of Significance Report - Rev 0 |
|
Mar 25, 2011 |
Draft Noise Assessment - Rev 0 |
|
Mar 25, 2011 |
Draft Stage 1 and 2 - Archaeological Assessment Report |
|
Mar 25, 2011 |
Draft Water Body Records Review Report - Rev 0 |
|
Mar 25, 2011 |
Draft Water Body Site Investigation Report - Rev 0 |
|
Mar 25, 2011 |
Draft Water Body Environmental Impact Study - Rev 0 |
|
Date | Title | PDF |
June 17, 2019 |
Amendment to Renewable Energy Approval |
|
Nov 16, 2018 |
Notice of Project Change |
|
Nov 16, 2018 |
Modification Document – Proposed On-Site Fuel Storage |
|
Aug 21, 2014 |
Amendment to Renewable Energy Approval |
|
Mar 12, 2014 |
REA Amendment 2 Application |
|
Mar 12, 2014 |
REA Amendment 2 Noise Study |
|
Mar 12, 2014 |
REA Amendment 2 Newspaper Notice |
|
Mar 11, 2014 |
Amended Renewable Energy Approval |
|
Mar 1, 2013 |
Project Change Letter to MOE |
|
Mar 1, 2013 |
Burk’s Falls East – Amendment Application Form |
|
Feb 16, 2012 |
Renewable Energy Approval |
|
Feb 16, 2012 |
REA Application Form |
|
Dec 22, 2011 |
Construction Plan Report - Rev 2 |
|
Dec 22, 2011 |
Decommissioning Plan Report - Rev 2 |
|
Dec 22, 2011 |
Design and Operations Report - Rev 2 |
|
Dec 22, 2011 |
Noise Assessment Report - Rev 2 |
|
Aug 17, 2011 |
Executive Summary - Rev 1 |
|
Aug 17, 2011 |
Construction Plan Report - Rev 1 |
|
Aug 17, 2011 |
Decommissioning Plan Report Rev 1 |
|
Aug 17, 2011 |
Design and Operations Report - Rev 1 |
|
Aug 17, 2011 |
Natural Heritage Environmental Impact Study - Rev 1 |
|
Aug 17, 2011 |
Natural Heritage Evaluation of Significance Report - Rev 1 |
|
Aug 17, 2011 |
Natural Heritage Site Investigation Report - Rev 1 |
|
Aug 17, 2011 |
Natural Heritage Records Review Report - Rev 1 |
|
Aug 17, 2011 |
Noise Assessment Report - Rev 1 |
|
Aug 17, 2011 |
Stage 1 and 2 - Archaeological Assessment Report |
|
Aug 17, 2011 |
Water Body Records Review Report - Rev 1 |
|
Aug 17, 2011 |
Water Body Site Investigation Report - Rev 1 |
|
Aug 17, 2011 |
Water Bodies Environmental Impact Study - Rev |
|
Aug 17, 2011 |
Project Description Report - Rev 1 |
|
Aug 17, 2011 |
Consultation Report Part 1 Main Report - Rev 1 |
|
Aug 17, 2011 |
Consultation Report Part 2 Appendixes A to C - Rev 1 |
|
Aug 17, 2011 |
Consultation Report Part 3 Appendixes D and E - Rev 1 |
|
Aug 17, 2011 |
Consultation Report Part 4 Appendixes F to K - Rev 1 |
|
Mar 10, 2011 |
Draft Executive Summary - Rev 0 |
|
Mar 10, 2011 |
Draft Construction Plan Report - Rev 0 |
|
Mar 10, 2011 |
Draft Decommissioning Plan Report |
|
Mar 10, 2011 |
Draft Design and Operations Plan - Rev 0 |
|
Mar 10, 2011 |
Draft Natural Heritage Environmental Impact Study - Rev E |
|
Mar 10, 2011 |
Draft Natural Heritage Site Investigation Report - Rev E |
|
Mar 10, 2011 |
Draft Natural Heritage Records Review Report - Rev D |
|
Mar 10, 2011 |
Draft Natural Heritage Evaluation of Significance Report - Rev D |
|
Mar 10, 2011 |
Draft Noise Assessment - Rev 0 |
|
Mar 10, 2011 |
Draft Stage 1 and 2 - Archaeological Assessment Report |
|
Mar 10, 2011 |
Draft Water Body Records Review Report - Rev D |
|
Mar 10, 2011 |
Draft Water Body Site Investigation Report - Rev D |
|
Mar 10, 2011 |
Draft Water Body Environmental Impact Study - Rev D |
|
Date | Title | PDF |
June 17, 2019 |
Amendment to Renewable Energy Approval |
|
Nov 16, 2018 |
Notice of Project Change |
|
Nov 16, 2018 |
Modification Document – Proposed On-Site Fuel Storage |
|
May 24, 2017 |
Application to Amend BFW REA Permit |
|
Apr 11, 2017 |
MOE Modifications Document |
|
Apr 11, 2013 |
Ammendent to Renewable Energy Approval |
|
Jan 24, 2013 |
Burk's Falls West - Project Change Letter to MOE |
|
Jan 11, 2013 |
Burk's Falls West - Field Study Report |
|
Jan 11, 2013 |
Burk’s Falls West - Letter RE Solar Project Wetland Boundaries |
|
Nov 22, 2012 |
Burk's Falls West - Renewable Energy Approval |
|
Nov 22, 2012 |
Burk's Falls West - Application for Approval of a Renewable Energy Project |
|
Sept 18, 2012 |
Burk's Falls West - Construction Plan Report - Rev 2 |
|
Sept 18, 2012 |
Burk's Falls West - Decommissioning Plan - Rev 2 |
|
Sept 18, 2012 |
Burks' Falls West - Design and Operations Report - Rev 2 |
|
Sept 18, 2012 |
Burk's Falls West - Natural Heritage Environmental Impact Study - Rev 2 |
|
Sept 18, 2012 |
Burk's Falls West - Noise Assessment Study Report - Rev 2 |
|
Sept 18, 2012 |
Burk's Falls West - Waterbodies Environmental Impact Study - Rev 2 |
|
Sept 18, 2012 |
Burk's Falls West - Project Description Report - Rev 2 |
|
Jan 11, 2012 |
Burk's Falls West - Construction Plan Report - Rev 1 |
|
Jan 11, 2012 |
Burk's Falls West - Consultation Report - Rev 0 |
|
Jan 11, 2012 |
Burk's Falls West - Decommissioning Plan - Rev 1 |
|
Jan 11, 2012 |
Burk's Falls West - Executive Summary - Rev 1 |
|
Jan 11, 2012 |
Burk's Falls West - Design and Operations Report - Rev 1 |
|
Jan 11, 2012 |
Burk's Falls West - Natural Heritage Site Investigation Report - Rev 1 |
|
Jan 11, 2012 |
Burk's Falls West - Natural Heritage Environmental Impact Study - Rev 1 |
|
Jan 11, 2012 |
Burk's Falls West - Natural Heritage Evaluation of Significance - Rev 1 |
|
Jan 11, 2012 |
Burk's Falls West - Natural Heritage Records Review - Rev 1 |
|
Jan 11, 2012 |
Burk's Falls West - Noise Assessment Study Report - Rev 2 |
|
Jan 11, 2012 |
Burk's Falls West - Waterbodies Environmental Impact Study - Rev 1 |
|
Jan 11, 2012 |
Burk's Falls West - Water Body Records Review Report - Rev 1 |
|
Jan 11, 2012 |
Burk's Falls West - Water Body Site Investigations Report - Rev 1 |
|
Jan 11, 2012 |
Burk's Falls West - Stage 1-2 Archaeological Assessment |
|
Jan 11, 2012 |
Burk's Falls West - Project Description Report |
|
Sept 8, 2011 |
Burk's Falls West - Draft Construction Plan Report - Rev 0 |
|
Sept 8, 2011 |
Burk's Falls West - Draft Decommissioning Plan - Rev 0 |
|
Sept 8, 2011 |
Burk's Falls West - Draft Executive Summary - Rev 0 |
|
Sept 8, 2011 |
Burks' Falls West - Design and Operations Report - Rev 0 |
|
Sept 8, 2011 |
Burk's Falls West - Draft Natural Heritage Site Investigation Report - Rev 0 |
|
Sept 8, 2011 |
Burk's Falls West - Draft Natural Heritage Environmental Impact Study - Rev 0 |
|
Sept 8, 2011 |
Burk's Falls West - Draft Natural Heritage Evaluation of Significance - Rev 0 |
|
Sept 8, 2011 |
Burk's Falls West - Draft Natural Heritage Records Review - Rev 0 |
|
Sept 8, 2011 |
Burk's Falls West - Draft Noise Assessment Study Report - Rev 0 |
|
Sept 8, 2011 |
Burk's Falls West - Draft Project Description Report - Rev 0 |
|
Sept 8, 2011 |
Burk's Falls West - Draft Waterbodies Environmental Impact Study - Rev 0 |
|
Sept 8, 2011 |
Burk's Falls West - Draft Water Body Records Review Report - Rev 0 |
|
Sept 8, 2011 |
Burk's Falls West - Draft Water Body Site Investigations Report - Rev 0 |
|
Sept 8, 2011 |
Burk's Falls West - Stage 1-2 Archaeological Assessment |
|
Cochrane
Date | Title | PDF |
June 27, 2019 |
Renewable Energy Approval - Amendment |
|
June 10, 2019 |
Project Modifications Document |
|
Jan 21, 2019 |
Project Modifications Document |
|
Oct 25, 2014 |
Renewable Energy Approval - Amendment |
|
May 1, 2014 |
Stage 1 and 2 Archaeological Assessment for Northland Power – Empire Solar Site (27.6 kV Transmission Line), Part of Lot 15, Concession 8, Township of Glackmeyer, District of Cochrane |
|
May 1, 2014 |
Stage 1 and 2 Archaeological Assessment for Long Lake Solar Project – Solar Switching Station, Part of Lot 1 & 28, Concessions 8 & 9, Town of Calder, District of Cochrane, Ontario |
|
May 1, 2014 |
Cochrane Solar Farm Project - Renewable Energy Approval (REA) #1290-9A4KSE Amendment |
|
May 1, 2014 |
Cochrane Solar Project – Project Design Change - Amendment Application – Renewable Energy Approval # 1290-9A4KSE |
|
May 1, 2014 |
Cochrane Solar Farm Project - Renewable Energy Approval (REA) Newspaper Advert |
|
May 1, 2014 |
Cochrane Solar Project - Notice of Minor Project Design Change |
|
Feb 19, 2014 |
Acceptance Letter – Cochrane Solar Project - Stage 1 and 2 Archaeological Assessment – Additional Lands |
|
Feb 19, 2014 |
Cochrane Solar Project – Stage 1 and 2 Archaeological Assessment – Additional Lands |
|
Dec 6, 2013 |
Notice of Application and Written Hearing (English) |
|
Dec 6, 2013 |
Notice of Application and Written Hearing (French) |
|
Oct 18, 2013 |
Acceptance Letter - Cochrane Solar Project – Stage 1 and 2 Archaeological Assessment – Solar Switching Station |
|
Oct 18, 2013 |
Cochrane Solar Project - Stage 1 and 2 Archaeological Assessment – Solar Switching Station |
|
Sept 4, 2013 |
Cochrane - Revised Noise Assessment Study Report |
|
Sept 4, 2013 |
Cochrane Solar Project - Renewable Energy Approval Application Form |
|
Sept 4, 2013 |
Cochrane Solar Project - Renewable Energy Approval |
|
Apr 24, 2013 |
Notice of EBR Posting |
|
Apr 24, 2013 |
Consultation Report - Main Text |
|
Apr 24, 2013 |
Consultation Report - Appendices A & B |
|
Apr 24, 2013 |
Consultation Report - Appendix C - Part 1 |
|
Apr 24, 2013 |
Consultation Report - Appendix C - Part 2 |
|
Apr 24, 2013 |
Consultation Report - Appendix D |
|
Apr 24, 2013 |
Consultation Report - Appendix E |
|
Apr 24, 2013 |
Consultation Report - Appendices F, G & H |
|
Apr 24, 2013 |
Consultation Report - Appendices I, J & K |
|
Feb 19, 2013 |
Project Description Report - Rev 1 |
|
Feb 19, 2013 |
Location Map |
|
Feb 19, 2013 |
Cochrane - Executive Summary - Rev 0 |
|
Feb 19, 2013 |
Design and Operations Report - Rev 0 |
|
Feb 19, 2013 |
Decommissioning Plan Report |
|
Feb 19, 2013 |
Construction Plan Report |
|
Feb 19, 2013 |
Natural Heritage Assessment and Water Bodies Reports Cover Letter |
|
Feb 19, 2013 |
Abitibi - Natural Heritage Site Investigations Report - Rev1 |
|
Feb 19, 2013 |
Abitibi - Natural Heritage Environmental Impact Study - Rev1 |
|
Feb 19, 2013 |
Abitibi - Natural Heritage Evaluation of Significance - Rev1 |
|
Feb 19, 2013 |
Abitibi - Natural Heritage Records Review - Rev1 |
|
Feb 19, 2013 |
Abitibi Water Bodies Environmental Impact Study - Rev2 |
|
Feb 19, 2013 |
Abitibi Water Bodies Records Review Report - Rev1 |
|
Feb 19, 2013 |
Abitibi Water Bodies Site Investigation Report - Rev1 |
|
Feb 19, 2013 |
Empire - Natural Heritage Environmental Impact Study - Rev1 |
|
Feb 19, 2013 |
Empire - Natural Heritage Evaluation of Significance - Rev1 |
|
Feb 19, 2013 |
Empire - Natural Heritage Records Review - Rev1 |
|
Feb 19, 2013 |
Empire - Natural Heritage Site Investigations Report |
|
Feb 19, 2013 |
Empire - Water Bodies Environmental Impact Study - Rev1 |
|
Feb 19, 2013 |
Empire - Water Bodies Records Review - Rev1 |
|
Feb 19, 2013 |
Empire - Water Bodies Site Investigation Report - Rev1 |
|
Feb 19, 2013 |
Martin's Meadows - Natural Heritage Environmental Impact Study - Rev1-2 |
|
Feb 19, 2013 |
Martin's Meadows - Natural Heritage Site Investigations Report - Rev1 |
|
Feb 19, 2013 |
Martin's Meadows - Natural Heritage Evaluation of Significance - Rev1 |
|
Feb 19, 2013 |
Martin's Meadows - Natural Heritage Records Review - Rev1 |
|
Feb 19, 2013 |
Martin's Meadows - Water Bodies Environmental Impact Study - Rev2 |
|
Feb 19, 2013 |
Martin's Meadows - Water Bodies Records Review - Rev1 |
|
Feb 19, 2013 |
Martin's Meadows - Water Bodies Site Investigations Report - Rev1 |
|
Feb 19, 2013 |
Archeological Reports Cover Letter |
|
Feb 19, 2013 |
Archeological Assessment Report - Stage 1 and 2 - Abitibi Solar Project |
|
Feb 19, 2013 |
Archeological Assessment Report - Stage 1 and 2 - Cochrane 115 kV Transmission Line |
|
Feb 19, 2013 |
Archeological Assessment Report - Stage 1 and 2 - Empire Solar Project |
|
Feb 19, 2013 |
Empire - Stage 1 and 2 Archeological Assessment - Additional Lands |
|
Feb 19, 2013 |
Archeological Assessment Report - Stage 1 and 2 - Martin's Meadows Solar Project |
|
Feb 19, 2013 |
Stage 1 and 2 Archaeological Report - Additional Lands Report |
|
Feb 19, 2013 |
Noise Assessment Study Report |
|
Abitibi
Date | Title | PDF |
Nov 1, 2012 |
Construction Plan Report - Rev 1 |
|
Nov 1, 2012 |
Decommissioning Plan Report - Rev 2 |
|
Nov 1, 2012 |
Design and Operations Report - Rev 1 |
|
Nov 1, 2012 |
Executive Summary - Rev 0 |
|
Nov 1, 2012 |
Natural Heritage - Environmental Impact Study - Rev.1 |
|
Nov 1, 2012 |
Natural Heritage - Evaluation of Significance - Rev 1 |
|
Nov 1, 2012 |
Natural Heritage - Records Review - Rev 1 |
|
Nov 1, 2012 |
Natural Heritage - Site Investigations Report - Rev 1 |
|
Nov 1, 2012 |
Noise Assessment Study Report Rev 1 |
|
Nov 1, 2012 |
Project Description Report - Rev 1 |
|
Nov 1, 2012 |
Stage 1-2 Archaeological Assessment Report - 115kV Transmission Line |
|
Nov 1, 2012 |
Stage 1-2 Archaeological Assessment Report |
|
Nov 1, 2012 |
Water Body - Environmental Impact Study Rev 2 |
|
Nov 1, 2012 |
Water Body - Records Review Report - Rev 1 |
|
Nov 1, 2012 |
Water Body - Site Investigation Report - Rev 1 |
|
Aug 23, 2012 |
Natural Heritage Environmental Impact Study - Rev 1 |
|
Aug 23, 2012 |
Water Body Environmental Impact Study Rev 1 |
|
June 20, 2012 |
Draft Executive Summary |
|
June 20, 2012 |
Draft Construction Plan Report |
|
June 20, 2012 |
Draft Decommissioning Plan Report |
|
June 20, 2012 |
Draft Design and Operations Report |
|
June 20, 2012 |
Draft Natural Heritage Environmental Impact Study |
|
June 20, 2012 |
Draft Natural Heritage Evaluation of Significance Report |
|
June 20, 2012 |
Draft Natural Heritage Records Review Report |
|
June 20, 2012 |
Draft Natural Heritage Site Investigation Report |
|
June 20, 2012 |
Draft Noise Assessment Study Report |
|
June 20, 2012 |
Draft Project Description Report |
|
June 20, 2012 |
Draft Stage 1 and 2 - Archaeological Assessment Report |
|
June 20, 2012 |
Draft Transmission Line - Stage 1 and 2 Archaeological Assessment Report |
|
June 20, 2012 |
Draft Water Body Environmental Impact Study |
|
June 20, 2012 |
Draft Water Body Review Report |
|
June 20, 2012 |
Draft Water Body Site Investigation Report |
|
May 24, 2012 |
Notice of a Public Meeting |
|
June 22, 2011 |
Updated Draft Project Description Report |
|
June 1, 2011 |
Draft Project Description Report |
|
June 1, 2011 |
Project Location Map |
|
Empire
Date | Title | PDF |
Nov 1, 2012 |
Construction Plan Report - Rev 1 |
|
Nov 1, 2012 |
Decommissioning Plan Report - Rev 2 |
|
Nov 1, 2012 |
Design and Operations Report - Rev 1 |
|
Nov 1, 2012 |
Executive Summary - Rev 0 |
|
Nov 1, 2012 |
Natural Heritage - Environmental Impact Study - Rev.1 |
|
Nov 1, 2012 |
Natural Heritage - Evaluation of Significance - Rev 1 |
|
Nov 1, 2012 |
Natural Heritage - Records Review - Rev 1 |
|
Nov 1, 2012 |
Natural Heritage - Site Investigations Report - Rev 1 |
|
Nov 1, 2012 |
Noise Assessment Study Report - Rev 1 |
|
Nov 1, 2012 |
Project Description Report - Rev 1.doc |
|
Nov 1, 2012 |
Stage 1-2 Archaeological Assessment Report - Additional Lands |
|
Nov 1, 2012 |
Stage 1-2 Archaeological Assessment Report - 115kV Transmission Line |
|
Nov 1, 2012 |
Stage 1-2 Archaeological Assessment |
|
Nov 1, 2012 |
Water Body - Environmental Impact Study Rev 2 |
|
Nov 1, 2012 |
Water Body - Records Review Report - Rev 1 |
|
Nov 1, 2012 |
Water Body - Site Investigation Report - Rev 1 |
|
Aug 23, 2012 |
Natural Heritage Environmental Impact Study - Rev 1 |
|
Aug 23, 2012 |
Water Body Environmental Impact Study Rev 1 |
|
Aug 8, 2012 |
Archaeological Assessment Report |
|
June 20, 2012 |
Draft Executive Summary |
|
June 20, 2012 |
Draft Construction Plan Report |
|
June 20, 2012 |
Draft Decommissioning Plan Report |
|
June 20, 2012 |
Draft Design and Operations Report |
|
June 20, 2012 |
Draft Natural Heritage Environmental Impact Study |
|
June 20, 2012 |
Draft Natural Heritage Evaluation of Significance Report |
|
June 20, 2012 |
Draft Natural Heritage Records Review Report |
|
June 20, 2012 |
Draft Natural Heritage Site Investigation Report |
|
June 20, 2012 |
Draft Noise Assessment Study Report |
|
June 20, 2012 |
Draft Project Description Report |
|
June 20, 2012 |
Draft Stage 1 and 2 - Archaeological Assessment Report |
|
June 20, 2012 |
Draft Transmission Line - Stage 1 and 2 Archaeological Assessment Report |
|
June 20, 2012 |
Draft Water Body Environmental Impact Study |
|
June 20, 2012 |
Draft Water Body Records Review Report |
|
June 20, 2012 |
Draft Water Body Site Investigation Report |
|
May 24, 2012 |
Notice of a Public Meeting |
|
June 22, 2011 |
Updated Draft Project Description Report |
|
June 1, 2011 |
Draft Project Description Report |
|
June 1, 2011 |
Project Location Map |
|
Martin's Meadows
Date | Title | PDF |
Nov 1, 2012 |
Construction Plan Report - Rev 1 |
|
Nov 1, 2012 |
Decommissioning Plan Report - Rev 2 |
|
Nov 1, 2012 |
Design and Operations Report - Rev 1 |
|
Nov 1, 2012 |
Executive Summary - Rev 0 |
|
Nov 1, 2012 |
Natural Heritage - Environmental Impact Study - Rev 1 |
|
Nov 1, 2012 |
Natural Heritage - Evaluation of Significance - Rev 1 |
|
Nov 1, 2012 |
Natural Heritage - Records Review - Rev 1 |
|
Nov 1, 2012 |
Natural Heritage - Site Investigations Report - Rev 1 |
|
Nov 1, 2012 |
Project Description Report - Rev 1 |
|
Nov 1, 2012 |
Stage 1-2 Archaeological Assessment Report - 115kV Transmission Line |
|
Nov 1, 2012 |
Stage 1-2 Archaeological Assessment Report |
|
Nov 1, 2012 |
Water Body - Environmental Impact Study Rev 2 |
|
Nov 1, 2012 |
Water Body - Records Review Report - Rev 1 |
|
Nov 1, 2012 |
Water Body - Site Investigation Report - Rev 1 |
|
Nov 1, 2012 |
Noise Assessment Report - Rev 1 |
|
Aug 23, 2012 |
Natural Heritage Environmental Impact Study - Rev 1 |
|
Aug 23, 2012 |
Water Body Environmental Impact Study Rev 1 |
|
June 20, 2012 |
Draft Executive Summary |
|
June 20, 2012 |
Draft Construction Plan Report |
|
June 20, 2012 |
Draft Decommissioning Plan Report |
|
June 20, 2012 |
Draft Design and Operations Report |
|
June 20, 2012 |
Draft Natural Heritage Environmental Impact Study |
|
June 20, 2012 |
Draft Natural Heritage Evaluation of Significance Report |
|
June 20, 2012 |
Draft Natural Heritage Records Review Report |
|
June 20, 2012 |
Draft Natural Heritage Site Investigation Report |
|
June 20, 2012 |
Draft Noise Assessment Study Report |
|
June 20, 2012 |
Draft Project Description Report |
|
June 20, 2012 |
Draft Stage 1 and 2 - Archaeological Assessment Report |
|
June 20, 2012 |
Draft Transmission Line - Stage 1 and 2 Archaeological Assessment Report |
|
June 20, 2012 |
Draft Water Body Records Review Report |
|
June 20, 2012 |
Draft Water Body Site Investigation Report |
|
May 24, 2012 |
Notice of a Public Meeting |
|
June 22, 2011 |
Updated Draft Project Description Report |
|
June 1, 2011 |
Draft Project Description Report |
|
June 1, 2011 |
Project Location Map |
|
OEB Leave to Construct
| | PDF |
Mar 7, 2014 |
Procedural Order #1 |
|
Mar 7, 2014 |
Procedural Order #2 |
|
Mar 7, 2014 |
Decision and Order - July 11, 2013 |
|
Mar 7, 2014 |
Board Staff Interrogatories - April 17, 2013 |
|
Mar 7, 2014 |
Letter of No Review - June 10, 2013 |
|
Mar 7, 2014 |
Acknowledgement Letter - April 23, 2013 |
|
Mar 12, 2013 |
OEB Notice of Application and Written Hearing [English] |
|
Mar 12, 2013 |
OEB Notice of Application and Written Hearing [French] |
|
Mar 11, 2013 |
Part 1 - Intro and Exhibit A |
|
Mar 11, 2013 |
Part 2 - Exhibit B |
|
Mar 11, 2013 |
Part 3 - Exhibits C and D |
|
Mar 11, 2013 |
Part 4 - Exhibits E and F |
|
Mar 11, 2013 |
Part 5a - Exhibit G - 1A |
|
Mar 11, 2013 |
Part 5b - Exhibit G - 1B |
|
Mar 11, 2013 |
Part 5c - Exhibit G - 1C |
|
Mar 11, 2013 |
Part 5d - Exhibit G - 1D |
|
Mar 11, 2013 |
Part 5e - Exhibit G - 1E |
|
Mar 11, 2013 |
Part 5f - Exhibit G - 1F |
|
Mar 11, 2013 |
Part 5g - Exhibit G - 1G |
|
Mar 11, 2013 |
Part 5h - Exhibit G - 1H |
|
Mar 11, 2013 |
Part 6 - Exhibit H |
|
Mar 11, 2013 |
Part 7 - Exhibit I |
|
Date | Title | PDF |
June 17, 2019 |
Amendment to Renewable Energy Approval |
|
Nov 16, 2018 |
Notice of Project Change |
|
Nov 16, 2018 |
Modification Document – Proposed On-Site Fuel Storage |
|
June 28, 2013 |
REA Permit Amendment June 28, 2013 |
|
Feb 22, 2013 |
Renewable Energy Approval Amendment Application Form |
|
Feb 22, 2013 |
Project Change Letter to MOE |
|
Apr 17, 2012 |
Notice of Application for Feed-in Tariff Program License |
|
Jan 24, 2012 |
REA Application Form |
|
Jan 24, 2012 |
Crosby Solar Project REA Number |
|
Jan 6, 2012 |
Wellwater Monitoring Program |
|
Dec 12, 2011 |
Construction Plan Report - Rev 1 |
|
Dec 12, 2011 |
Decommissioning Plan Report - Rev 1 |
|
Dec 12, 2011 |
Design and Operations Report - Rev 1 |
|
Dec 12, 2011 |
Noise Assessment Study Report - Rev 3 |
|
July 26, 2011 |
Executive Summary |
|
July 26, 2011 |
Construction Plan Report |
|
July 26, 2011 |
Consultation Report |
|
July 26, 2011 |
Consultation Report - Appendixes A to D |
|
July 26, 2011 |
Consultation Report - Appendixes E to J |
|
July 26, 2011 |
Decommissioning Plan Report |
|
July 26, 2011 |
Design and Operations Report |
|
July 26, 2011 |
Natural Heritage Environmental Impact Study |
|
July 26, 2011 |
Natural Heritage Evaluation of Significance Report |
|
July 26, 2011 |
Natural Heritage Records Review Report |
|
July 26, 2011 |
Natural Heritage Site Investigation Report |
|
July 26, 2011 |
Noise Assessment Report |
|
July 26, 2011 |
Project Description Report |
|
July 26, 2011 |
Stage 1 and 2 - Archaeological Assessment Report |
|
July 26, 2011 |
Water Bodies Environmental Impact Study |
|
July 26, 2011 |
Water Body Records Review Report |
|
July 26, 2011 |
Water Body Site Investigation Report |
|
Jan 4, 2011 |
Draft Executive Summary - Rev 0 |
|
Jan 4, 2011 |
Draft Construction Plan Report - Rev 0 |
|
Jan 4, 2011 |
Draft Decommissioning Plan Report |
|
Jan 4, 2011 |
Draft Design and Operations Report - Rev 0 |
|
Jan 4, 2011 |
Draft Natural Heritage Environmental Impact Study - Rev E |
|
Jan 4, 2011 |
Draft Natural Heritage Site Investigation Report - Rev E |
|
Jan 4, 2011 |
Draft Natural Heritage Records Review Report - Rev D |
|
Jan 4, 2011 |
Draft Natural Heritage Evaluation of Significance Report - Rev E |
|
Jan 4, 2011 |
Draft Noise Assessment - Rev 1 |
|
Jan 4, 2011 |
Draft Stage 1 and 2 - Archaeological Assessment Report |
|
Jan 4, 2011 |
Draft Water Body Records Review Report - Rev 0 |
|
Jan 4, 2011 |
Draft Water Body Site Investigation Report - Rev 0 |
|
Jan 4, 2011 |
Draft Water Bodies Environmental Impact Study - Rev 0 |
|
Date | Title | PDF |
Feb 15, 2024 |
Modification Document – Limited Herbicide Application (Revised) |
|
Dec 13, 2023 |
Modification Document–Limited Herbicide Application |
|
June 17, 2019 |
Amendment to Renewable Energy Approval |
|
Nov 16, 2018 |
Notice of Project Change |
|
Nov 16, 2018 |
Modification Document – Proposed On-Site Fuel Storage |
|
Sept 10, 2013 |
Stage 3 Archaeological Assessment |
|
Apr 11, 2013 |
Amendment to Renewable Energy Approval |
|
Mar 5 2013 |
Acknowledgement letter re: Application for Approval of Renewable Energy Approval Amendment |
|
Mar 1, 2013 |
Project Change Letter to MOE |
|
Mar 1, 2013 |
Amendment Application Form |
|
June 28, 2012 |
Renewable Energy Approval |
|
June 28, 2012 |
REA Application Form |
|
Dec 12, 2011 |
Executive Summary |
|
Dec 12, 2011 |
Construction Plan Report |
|
Dec 12, 2011 |
Consultation Report - Main Report and Appendices A to C |
|
Dec 12, 2011 |
Consultation Report - Appendix D |
|
Dec 12, 2011 |
Consultation Report - Appendix E |
|
Dec 12, 2011 |
Consultation Report - Appendix F to Appendix J |
|
Dec 12, 2011 |
Decommissioning Plan Report |
|
Dec 12, 2011 |
Design and Operations Report |
|
Dec 12, 2011 |
Natural Heritage Environmental Impact Study |
|
Dec 12, 2011 |
Natural Heritage Site Investigation Report |
|
Dec 12, 2011 |
Natural Heritage Records Review Report |
|
Dec 12, 2011 |
Natural Heritage Evaluation of Significance Report |
|
Dec 12, 2011 |
Noise Assessment Study Report |
|
Dec 12, 2011 |
Stage 1-2 Archaeological Assessment Report |
|
Dec 12, 2011 |
Stage 1-2 Archaeological Assessment Report - Additional Lands |
|
Dec 12, 2011 |
Water Body Records Review Report |
|
Dec 12, 2011 |
Water Body Site Investigation Report |
|
Dec 12, 2011 |
Water Bodies Environmental Impact Study |
|
Dec 12, 2011 |
Project Description Report |
|
Aug 2, 2011 |
Draft Executive Summary - Rev 0 |
|
Aug 2, 2011 |
Draft Construction Plan Report - Rev 0 |
|
Aug 2, 2011 |
Draft Decommissioning Plan Report |
|
Aug 2, 2011 |
Draft Design and Operations Report - Rev 0 |
|
Aug 2, 2011 |
Draft Natural Heritage Environmental Impact Study - Rev 0 |
|
Aug 2, 2011 |
Draft Natural Heritage Site Investigation Report - Rev 0 |
|
Aug 2, 2011 |
Draft Natural Heritage Records Review Report - Rev 0 |
|
Aug 2, 2011 |
Draft Natural Heritage Evaluation of Significance Report - Rev 0 |
|
Aug 2, 2011 |
Draft Noise Assessment Study Report - Rev 0 |
|
Aug 2, 2011 |
Draft Archaeological Assessment Report |
|
Aug 2, 2011 |
Draft Archaeological Assessment Report - Additional Lands |
|
Aug 2, 2011 |
Draft Water Body Records Review Report - Rev 0 |
|
Aug 2, 2011 |
Draft Water Body Site Investigation Report - Rev 0 |
|
Aug 2, 2011 |
Draft Water Bodies Environmental Impact Study - Rev 0 |
|
Aug 2, 2011 |
Draft Project Description Report - Rev 0 |
|
July 4, 2011 |
Draft Project Description Report - Rev 0 |
|
Long Lake
Date | Title | PDF |
Jul 23, 2019 |
REA Amendment Application |
|
Oct 25, 2014 |
Renewable Energy Approval - Amendment |
|
Feb 19, 2014 |
REA Amendment Application |
|
Feb 19, 2014 |
REA Amendment Application - Tabs 1-3 |
|
Feb 19, 2014 |
REA Amendment Newspaper Notice |
|
Feb 19, 2014 |
Archaeological Assessment Report Acceptance Letter |
|
Feb 19, 2014 |
Long Lake Solar Project – Stage 3 Archaeological Assessment |
|
Jan 31, 2014 |
Long Lake - Acceptance letter for the assessment of transmission line lands |
|
Dec 10, 2013 |
Long Lake acceptance letter-1 |
|
Dec 10, 2013 |
Long Lake acceptance letter-2 |
|
Dec 6, 2013 |
Notice of Application and Written Hearing (English) |
|
Dec 6, 2013 |
Notice of Application and Written Hearing (French) |
|
Nov 14, 2013 |
Stage 1 and 2 Archaeological Assessment for Long Lake Solar Project (Additional Lands) – Solar Switching Station Part of Lot 2 & 3, Concessions 8 |
|
Oct 18, 2013 |
Cochrane Solar Project - Stage 1 and 2 Archaeological Assessment – Solar Switching Station |
|
Sep 4, 2013 |
Long Lake - Revised Noise Assessment Report |
|
Sep 4, 2013 |
Long Lake Solar Project - Renewable Energy Approval Application Form |
|
Sep 4, 2013 |
Long Lake Solar Project - Renewable Energy Approval |
|
Aug 13, 2013 |
Project Change Letter to MOE |
|
Aug 13, 2013 |
Long Lake Noise Assessment Study Report |
|
Feb 20, 2013 |
Notice of Posting to Environmental Registry |
|
Feb 20, 2013 |
Renewable Energy Approval Application Form |
|
Feb 20, 2013 |
Consultation Report - Rev 0 - Part 1 - Report, Appendix A-D |
|
Feb 20, 2013 |
Consultation Report - Rev 0 - Part 2 - Appendix E-J |
|
Oct 25, 2012 |
Construction Plan Report |
|
Jan 18, 2013 |
Stage 1 and 2 Archaeological Assessment Report |
|
Jan 18, 2013 |
Executive Summary – Rev 1 |
|
Oct 25, 2012 |
Construction Plan Report |
|
Oct 24, 2012 |
Construction Plan Report - Rev 1 |
|
Oct 24, 2012 |
Decommissioning Plan - Rev 1 |
|
Oct 24, 2012 |
Design Operation Plan - Rev 1 |
|
Oct 24, 2012 |
Executive Summary - Rev 0 |
|
Oct 24, 2012 |
Natural Heritage Environmental Impact Study - Rev 1 |
|
Oct 24, 2012 |
Natural Heritage Evaluation of Significance - Rev 1 |
|
Oct 24, 2012 |
Natural Heritage Records Review - Rev 1 |
|
Oct 24, 2012 |
Natural Heritage Site Investigations Report - Rev 1 |
|
Oct 24, 2012 |
Noise Assessment Report_Rev 0 |
|
Oct 24, 2012 |
Project Description Report - Rev 1 |
|
Oct 24, 2012 |
Stage 1-2 Archaeological Assessment Report |
|
Oct 24, 2012 |
Water Body Environmental Impact Study - Rev 1 |
|
Oct 24, 2012 |
Water Body Records Review Report - Rev 1 |
|
Oct 24, 2012 |
Water Body Site Investigation Report - Rev 1 |
|
Aug 23, 2012 |
Natural Heritage Environmental Impact Study - Rev 1 |
|
Aug 23, 2012 |
Water Body Environmental Impact Study Rev 1 |
|
Jun 4, 2012 |
Draft Executive Summary - Rev A |
|
Jun 4, 2012 |
Draft Construction Plan Report - Rev 0 |
|
Jun 4, 2012 |
Draft Decommissioning Plan Report - Rev 0 |
|
Jun 4, 2012 |
Draft Design and Operations Report - Rev 0 |
|
Jun 4, 2012 |
Draft Natural Heritage Environmental Impact Study - Rev 0 |
|
Jun 4, 2012 |
Draft Natural Heritage Evaluation of Significance Report - Rev 0 |
|
Jun 4, 2012 |
Draft Natural Heritage Records Review Report - Rev 0 |
|
Jun 4, 2012 |
Draft Natural Heritage Site Investigation Report - Rev 0 |
|
Jun 4, 2012 |
Draft Noise Assessment Report - Rev 0 |
|
Jun 4, 2012 |
Draft Project Description Report - Rev 0 |
|
Jun 4, 2012 |
Draft Stage 1 and 2 - Archaeological Assessment Report |
|
Jun 4, 2012 |
Draft Water Bodies Environmental Impact Study - Rev 0 |
|
Jun 4, 2012 |
Draft Water Body Records Review Report - Rev 0 |
|
Jun 4, 2012 |
Draft Water Body Site Investigation Report - Rev A |
|
May 24, 2012 |
Notice of a Public Meeting |
|
Jun 22, 2011 |
Updated Draft Project Description Report |
|
Jun 1, 2011 |
Draft Project Description Report |
|
Jun 1, 2011 |
Project Location Map |
|
OEB Leave to Construct Long Lake
Date | Title | PDF |
Mar 7, 2014 |
Procedural Order #1 |
|
Mar 7, 2014 |
Procedural Order #2 |
|
Mar 7, 2014 |
Decision and Order - Jul 11, 2013 |
|
Mar 7, 2014 |
Board Staff Interrogatories - Apr 17, 2013 |
|
Mar 7, 2014 |
Letter of No Review - Jun 10, 2013 |
|
Mar 7, 2014 |
Acknowledgement Letter - Apr 23, 2013 |
|
Mar 12, 2013 |
OEB Notice of Application and Written Hearing [English] |
|
Mar 12, 2013 |
OEB Notice of Application and Written Hearing [French] |
|
Mar 11, 2013 |
Part 1 - Intro and Exhibit A |
|
Mar 11, 2013 |
Part 2 - Exhibit B |
|
Mar 11, 2013 |
Part 3 - Exhibits C and D |
|
Mar 11, 2013 |
Part 4 - Exhibits E and F |
|
Mar 11, 2013 |
Part 5a - Exhibit G - 1A |
|
Mar 11, 2013 |
Part 5b - Exhibit G - 1B |
|
Mar 11, 2013 |
Part 5c - Exhibit G - 1C |
|
Mar 11, 2013 |
Part 5d - Exhibit G - 1D |
|
Mar 11, 2013 |
Part 5e - Exhibit G - 1E |
|
Mar 11, 2013 |
Part 5f - Exhibit G - 1F |
|
Mar 11, 2013 |
Part 5g - Exhibit G - 1G |
|
Mar 11, 2013 |
Part 5h - Exhibit G - 1H |
|
Mar 11, 2013 |
Part 6 - Exhibit H |
|
Mar 11, 2013 |
Part 7 - Exhibit I |
|
Date | Title | PDF |
June 17, 2019 |
Amendment to Renewable Energy Approval |
|
Nov 16, 2018 |
Notice of Project Change |
|
Nov 16, 2018 |
Modification Document – Proposed On-Site Fuel Storage |
|
Aug 21, 2014 |
Amendment to Renewable Energy Approval |
|
Mar 12, 2014 |
REA Amendment Application |
|
Mar 12, 2014 |
REA Amendment Noise Study |
|
Mar 12, 2014 |
REA Amendment Newspaper Notice |
|
Mar 1, 2012 |
Renewable Energy Approval |
|
Mar 1, 2012 |
REA Application Form |
|
Jan 19, 2012 |
Noise Assessment Report - Rev 3 |
|
Jan 6, 2012 |
Wellwater Monitoring Program |
|
Dec 12, 2011 |
Construction Plan Report - Rev 2 |
|
Dec 12, 2011 |
Decommissioning Plan - Rev 2 |
|
Dec 12, 2011 |
Design and Operations Plan - Rev 2 |
|
Dec 12, 2011 |
Noise Assessment Study Report - Rev 2 |
|
Nov 9, 2011 |
Executive Summary - Rev 1 |
|
Nov 9, 2011 |
Construction Plan Report - Rev 1 |
|
Nov 9, 2011 |
Decommissioning Plan Report - Rev 1 |
|
Nov 9, 2011 |
Design and Operations Plan - Rev 1 |
|
Nov 9, 2011 |
Natural Heritage Environmental Impact Study - Rev 1 |
|
Nov 9, 2011 |
Natural Heritage Site Investigation Report - Rev 1 |
|
Nov 9, 2011 |
Natural Heritage Records Review Report - Rev 1 |
|
Nov 9, 2011 |
Natural Heritage Evaluation of Significance Report - Rev 1 |
|
Nov 9, 2011 |
Noise Assessment Report - Rev 1 |
|
Nov 9, 2011 |
Stage 1 and 2 - Archaeological Assessment Report - Rev 1 |
|
Nov 9, 2011 |
Water Body Records Review Report - Rev 1 |
|
Nov 9, 2011 |
Water Body Site Investigation Report - Rev 1 |
|
Nov 9, 2011 |
Water Body Environmental Impact Study - Rev 1 |
|
Nov 9, 2011 |
Consultation Report - Main Report and Appendixes A-B |
|
Nov 9, 2011 |
Consultation Report - Appendixes C-D |
|
Nov 9, 2011 |
Consultation Report - Appendixes E-J |
|
Nov 9, 2011 |
Project Description Report - Rev 1 |
|
Apr 19, 2011 |
Draft Executive Summary - Rev 0 |
|
Apr 19, 2011 |
Draft Construction Plan Report - Rev 0 |
|
Apr 19, 2011 |
Draft Decommissioning Plan Report - Rev 0 |
|
Apr 19, 2011 |
Draft Design and Operations Plan - Rev 0 |
|
Apr 19, 2011 |
Draft Natural Heritage Environmental Impact Study - Rev 0 |
|
Apr 19, 2011 |
Draft Natural Heritage Site Investigation Report - Rev 0 |
|
Apr 19, 2011 |
Draft Natural Heritage Records Review Report - Rev 0 |
|
Apr 19, 2011 |
Draft Natural Heritage Evaluation of Significance Report - Rev 0 |
|
Apr 19, 2011 |
Draft Noise Assessment Report - Rev 0 |
|
Apr 19, 2011 |
Draft Stage 1 and 2 - Archaeological Assessment Report |
|
Apr 19, 2011 |
Draft Water Body Records Review Report - Rev 0 |
|
Apr 19, 2011 |
Draft Water Body Site Investigation Report - Rev 0 |
|
Apr 19, 2011 |
Draft Water Body Environmental Impact Study - Rev 0 |
|
Date | Title | PDF |
Feb 15, 2024 |
Modification Document |
|
Feb 15, 2024 |
Project Change Notice |
|
June 17, 2019 |
Amendment to Renewable Energy Approval |
|
Nov 16, 2018 |
Notice of Project Change |
|
Nov 16, 2018 |
Modification Document – Proposed On-Site Fuel Storage |
|
Feb 19, 2014 |
REA Amendment Application |
|
Feb 19, 2014 |
REA Amendment Newspaper Notice |
|
Jun 12, 2013 |
Project Change Letter to MOE - Revised |
|
Jun 12, 2013 |
MOE Letter with Attachments |
|
Apr 11, 2013 |
Amendment to Renewable Energy Approval |
|
Mar 21, 2013 |
Rideau Valley Conservation Authority Response to Amendment Application |
|
Feb 22, 2013 |
Renewable Energy Approval Amendment Application Form |
|
Feb 22, 2013 |
Project Change Letter to MOE |
|
Nov 8, 2012 |
REA Application |
|
Nov 8, 2012 |
REA Approval |
|
Oct 25, 2012 |
Natural Heritage - Environmental Impact Study |
|
Oct 25, 2012 |
Executive Summary |
|
Sep 18, 2012 |
Construction Plan Report - Rev 2 |
|
Sep 18, 2012 |
Decommissioning Plan Report - Rev 2 |
|
Sep 18, 2012 |
Design and Operations Report - Rev 2 |
|
Sep 18, 2012 |
Natural Heritage Environmental Impact Study - Rev 2 |
|
Sep 18, 2012 |
Noise Assessment Study Report - Rev 3 |
|
Sep 18, 2012 |
Project Description Report - Rev 2 |
|
Sep 18, 2012 |
Water Body Records Review Report - Rev 2 |
|
Sep 18, 2012 |
Water Body Site Investigation Report - Rev 2 |
|
Sep 18, 2012 |
Water Bodies Environmental Impact Study - Rev 2 |
|
Jan 18, 2012 |
Construction Plan Report - Rev 1 |
|
Jan 18, 2012 |
Consultation Plan Report - Rev 0 - Main Text to Appendix C |
|
Jan 18, 2012 |
Consultation Report - Rev 0 - Appendix D |
|
Jan 18, 2012 |
Consultation Report - Rev 0 - Appendixes E to J |
|
Jan 18, 2012 |
Decommissioning Plan Report - Rev 1 |
|
Jan 18, 2012 |
Design and Operations Report - Rev 1 |
|
Jan 18, 2012 |
Executive Summary - Rev 1 |
|
Jan 18, 2012 |
Natural Heritage Environmental Impact Study - Rev 1 |
|
Jan 18, 2012 |
Natural Heritage Evaluation of Significance Report - Rev 1 |
|
Jan 18, 2012 |
Natural Heritage Records Review Report - Rev 1 |
|
Jan 18, 2012 |
Natural Heritage Site Investigation Report - Rev 1 - Main Text and Appendix A |
|
Jan 18, 2012 |
Natural Heritage Site Investigation Report - Rev 1 - Appendixes B and C |
|
Jan 18, 2012 |
Noise Assessment Study Report - Rev 2 |
|
Jan 18, 2012 |
Project Description Report - Rev 1 |
|
Jan 18, 2012 |
Stage 1 and 2 - Archaeological Assessment Report |
|
Jan 18, 2012 |
Water Body Records Review Report - Rev 1 |
|
Jan 18, 2012 |
Water Body Site Investigation Report - Rev 1 |
|
Jan 18, 2012 |
Water Bodies Environmental Impact Study - Rev 1 |
|
Jan 6, 2012 |
Baseline Wellwater Monitoring Program |
|
Aug 25, 2011 |
Draft Executive Summary - Rev 0 |
|
Aug 25, 2011 |
Draft Project Description Report - Rev 0 |
|
Aug 25, 2011 |
Draft Construction Plan Report - Rev 0 |
|
Aug 25, 2011 |
Draft Decommissioning Plan Report - Rev 0 |
|
Aug 25, 2011 |
Draft Design and Operations Plan - Rev 0 |
|
Aug 25, 2011 |
Draft Natural Heritage Environmental Impact Study - Rev 0 |
|
Aug 25, 2011 |
Draft Natural Heritage Site Investigation Report - Rev 0 |
|
Aug 25, 2011 |
Draft Natural Heritage Records Review Report - Rev 0 |
|
Aug 25, 2011 |
Draft Natural Heritage Evaluation of Significance Report - Rev 0 |
|
Aug 25, 2011 |
Draft Noise Assessment Study Report - Rev 0 |
|
Aug 25, 2011 |
Draft Stage 1 and 2 - Archaeological Assessment Report |
|
Aug 25, 2011 |
Draft Water Body Records Review Report - Rev 0 |
|
Aug 25, 2011 |
Draft Water Body Site Investigation Report - Rev 0 |
|
Aug 25, 2011 |
Draft Water Bodies Environmental Impact Study - Rev 0 |
|
Date | Title | PDF |
Nov 16, 2018 |
Notice of Project Change |
|
Nov 16, 2018 |
Modification Document – Proposed On-Site Fuel Storage |
|
Feb 13, 2012 |
Renewable Energy Approval |
|
Feb 13, 2012 |
REA Application Form |
|
Jan 6, 2012 |
Wellwater Monitoring Program |
|
Dec 8, 2011 |
Construction Plan Report - Rev 2 |
|
Dec 8, 2011 |
Decommissioning Plan Report Rev 2 |
|
Dec 8, 2011 |
Design and Operations Report - Rev 2 |
|
Dec 8, 2011 |
Noise Assessment Report - Rev 3 |
|
Aug 17, 2011 |
Executive Summary - Rev 1 |
|
Aug 17, 2011 |
Construction Plan Report - Rev 1 |
|
Aug 17, 2011 |
Decommissioning Plan Report Rev 1 |
|
Aug 17, 2011 |
Design and Operations Report - Rev 1 |
|
Aug 17, 2011 |
Natural Heritage Environmental Impact Study - Rev 1 |
|
Aug 17, 2011 |
Natural Heritage Evaluation of Significance Report - Rev 1 |
|
Aug 17, 2011 |
Natural Heritage Site Investigation Report - Rev 1 |
|
Aug 17, 2011 |
Natural Heritage Records Review Report - Rev 1 |
|
Aug 17, 2011 |
Noise Assessment Report - Rev 1 |
|
Aug 17, 2011 |
Stage 1 and 2 - Archaeological Assessment Report |
|
Aug 17, 2011 |
Water Body Records Review Report - Rev 1 |
|
Aug 17, 2011 |
Water Body Site Investigation Report - Rev 1. |
|
Aug 17, 2011 |
Water Bodies Environmental Impact Study - Rev 1 |
|
Aug 17, 2011 |
Project Description Report - Rev 1 |
|
Aug 17, 2011 |
Consultation Report Part 1 Main Report - Rev 1 |
|
Aug 17, 2011 |
Consultation Report Part 2 Appendixes A to E - Rev 1 |
|
Aug 17, 2011 |
Consultation Report Part 3 Appendixes F to J - Rev 1 |
|
Jan 4, 2011 |
Draft Executive Summary - Rev 0 |
|
Jan 4, 2011 |
Draft Construction Plan Report - Rev 0 |
|
Jan 4, 2011 |
Draft Decommissioning Plan Report |
|
Jan 4, 2011 |
Draft Design and Operations Report - Rev 0 |
|
Jan 4, 2011 |
Draft Natural Heritage Environmental Impact Study - Rev E |
|
Jan 4, 2011 |
Draft Natural Heritage Evaluation of Significance Report - Rev E |
|
Jan 4, 2011 |
Draft Natural Heritage Site Investigation Report - Rev E |
|
Jan 4, 2011 |
Draft Natural Heritage Records Review Report - Rev D |
|
Jan 4, 2011 |
Draft Noise Assessment Report - Rev 0 |
|
Jan 4, 2011 |
Draft Stage 1 and 2 - Archaeological Assessment Report |
|
Jan 4, 2011 |
Draft Water Body Records Review Report - Rev 0 |
|
Jan 4, 2011 |
Draft Water Body Site Investigation Report - Rev 0 |
|
Jan 4, 2011 |
Draft Water Bodies Environmental Impact Study - Rev 0 |
|
Onshore Wind
Maps
Date | Title | PDF |
|
Project Map |
|
|
Project Map "As Built" - 2016 |
|
Ontario Energy Board - Electricity Generation Licence
Date | Title | PDF |
Oct 14, 2014 |
Notice of Application and Written Hearing |
|
Community Liaison
Date | Title | PDF |
Oct 17, 2016 |
CLC Meeting #2 Presentation |
|
Oct 11, 2016 |
Notice CLC Meeting #2 |
|
Oct 11, 2016 |
CLC Meeting #1 Discussion |
|
Dec 11, 2015 |
CLC Meeting #1 Presentation |
|
Dec 9, 2015 |
Notice - CLC Meeting #1 |
|
Mar 26, 2015 |
CLC Member Recruitment Notice |
|
Environmental Review Tribunal (ERT) Documents
Date | Title | PDF |
Jan 8, 2015 |
REA Appeal - ERT Decision |
|
Jul 27, 2014 |
ERT Notice of Preliminary Hearing and Hearing |
|
Jul 27, 2014 |
ERT Notice to Land Owners Interested Parties |
|
REA Approval Documentation
Date | Title | PDF |
Jul 18, 2014 |
Final Noise Report |
|
Jul 18, 2014 |
Attachment E_Final Noise Report_April 15 2014 |
|
Jul 3, 2014 |
REA Approval |
|
Apr 7, 2014 |
Noise Report |
|
Apr 7, 2014 |
Mapped Noise Levels at Wind Speed of 6 m/s |
|
Apr 7, 2014 |
Mapped Noise Levels at Wind Speed of 8 m/s |
|
Apr 7, 2014 |
Mapped Noise Levels at Wind Speed of 10 m/s |
|
Feb 5, 2014 |
Notice of Proposed Change |
|
Feb 5, 2014 |
Project Change Reporting Letter |
|
Feb 5, 2014 |
Wind Turbine Specification Report |
|
Feb 5, 2014 |
Noise Report |
|
Feb 5, 2014 |
Mapped Noise Levels at Wind Speed of 6 m/s |
|
Feb 5, 2014 |
Mapped Noise Levels at Wind Speed of 8 m/s |
|
Feb 5, 2014 |
Mapped Noise Levels at Wind Speed of 10 m/s |
|
Sep 2, 2013 |
Project Description Report |
|
Sep 2, 2013 |
Archaeological Assessment 2012 Minor Modifications Report |
|
Sep 2, 2013 |
Archaeological Assessment 2013 Minor Modifications Report |
|
Sep 2, 2013 |
Archaeological Assessment |
|
Sep 2, 2013 |
Construction Plan Report |
|
Sep 2, 2013 |
Consultation Report_1_Body |
|
Sep 2, 2013 |
Consultation Report_2_AppA-B |
|
Sep 2, 2013 |
Consultation Report_3_AppC |
|
Sep 2, 2013 |
Consultation Report_4_AppD1-D2 |
|
Sep 2, 2013 |
Consultation Report_5_AppD3-D6 |
|
Sep 2, 2013 |
Consultation Report_6_AppE-F |
|
Sep 2, 2013 |
Consultation Report_7_AppG |
|
Sep 2, 2013 |
Cultural Heritage Assessment |
|
Sep 2, 2013 |
Decommissioning Plan Report |
|
Sep 2, 2013 |
Design and Operations Report_1_Body |
|
Sep 2, 2013 |
Design and Operations Report_2_AppA |
|
Sep 2, 2013 |
Design and Operations Report_3_AppB |
|
Sep 2, 2013 |
Design and Operations Report_4_AppC |
|
Sep 2, 2013 |
Design and Operations Report_5_AppD1 |
|
Sep 2, 2013 |
Design and Operations Report_6_AppD2 |
|
Sep 2, 2013 |
Design and Operations Report_7_AppE |
|
Sep 2, 2013 |
Design and Operations Report_8_AppF |
|
Sep 2, 2013 |
Natural Heritage Assessment, Part I, Records Review Report_1_Body |
|
Sep 2, 2013 |
Natural Heritage Assessment, Part I, Records Review Report_2_AppA |
|
Sep 2, 2013 |
Natural Heritage Assessment, Part I, Records Review Report_3_AppB-C |
|
Sep 2, 2013 |
Natural Heritage Assessment, Part II, Site Investigation Report_1_Body |
|
Sep 2, 2013 |
Natural Heritage Assessment, Part II, Site Investigation Report_2_AppA1 |
|
Sep 2, 2013 |
Natural Heritage Assessment, Part II, Site Investigation Report_3_AppA2 |
|
Sep 2, 2013 |
Natural Heritage Assessment, Part II, Site Investigation Report_4_AppB-E |
|
Sep 2, 2013 |
Natural Heritage Assessment, Part II, Site Investigation Report_5_AppF-G |
|
Sep 2, 2013 |
Natural Heritage Assessment, Part III, Evaluation of Significance_1_Body |
|
Sep 2, 2013 |
Natural Heritage Assessment, Part III, Evaluation of Significance_2_AppA1 |
|
Sep 2, 2013 |
Natural Heritage Assessment, Part III, Evaluation of Significance_3_AppA2 |
|
Sep 2, 2013 |
Natural Heritage Assessment, Part III, Evaluation of Significance_4_AppB-C |
|
Sep 2, 2013 |
Natural Heritage Assessment, Part III, Evaluation of Significance_5_AppD |
|
Sep 2, 2013 |
Natural Heritage Assessment, Part IV, Environmental Impact Study_1_Body |
|
Sep 2, 2013 |
Natural Heritage Assessment, Part IV, Environmental Impact Study_2_AppA1 |
|
Sep 2, 2013 |
Natural Heritage Assessment, Part IV, Environmental Impact Study_3_AppA2 |
|
Sep 2, 2013 |
Natural Heritage Assessment, Part IV, Environmental Impact Study_4_AppA3 |
|
Sep 2, 2013 |
Natural Heritage Assessment, Part IV, Environmental Impact Study_5_AppB-E |
|
Sep 2, 2013 |
Natural Heritage Assessment, Part V, MNR Confirmation |
|
Sep 2, 2013 |
Natural Heritage Environmental Effects Monitoring Plan |
|
Sep 2, 2013 |
Noise Impact Assessment |
|
Sep 2, 2013 |
Telecom Impact Study |
|
Sep 2, 2013 |
Water Assessment and Water Body Report_1_Body |
|
Sep 2, 2013 |
Water Assessment and Water Body Report_2_AppA |
|
Sep 2, 2013 |
Water Assessment and Water Body Report_3_AppB_to_H |
|
Sep 2, 2013 |
Wind Turbine Specifications Report |
|
Dec 19, 2012 |
Public Information Centre Boards |
|
Oct 24, 2012 |
Notice of Draft Site Plan Extension |
|
Oct 17, 2012 |
REA Submission Extension Request |
|
Oct 17, 2012 |
REA Submission Extension Confirmation |
|
Sep 28, 2012 |
Project Update Report |
|
Sep 26, 2012 |
Draft Water Assessment and Water Body Report |
|
Sep 26, 2012 |
Draft Site Investigation Report |
|
Sep 26, 2012 |
Appendix A |
|
Sep 26, 2012 |
Appendix B |
|
Sep 26, 2012 |
Appendix C |
|
Sep 26, 2012 |
Appendix D |
|
Sep 26, 2012 |
Appendix E |
|
Sep 26, 2012 |
Appendix F |
|
Sep 26, 2012 |
Appendix G |
|
Sep 26, 2012 |
Appendix H |
|
Sep 26, 2012 |
Draft Records Review Report |
|
Sep 26, 2012 |
Draft Project Description Report |
|
Sep 26, 2012 |
Draft Evaluation of Significance Report |
|
Sep 26, 2012 |
Appendix A |
|
Sep 26, 2012 |
Appendix B |
|
Sep 26, 2012 |
Appendix C |
|
Sep 26, 2012 |
Appendix D |
|
Sep 26, 2012 |
Appendix D -- Amphibian Surveys |
|
Sep 26, 2012 |
Appendix D -- Brewers Blackbird Surveys |
|
Sep 26, 2012 |
Appendix D -- Common Nighthawk and Marsh Bird Surveys |
|
Sep 26, 2012 |
Appendix D -- Reptile Surveys |
|
Sep 26, 2012 |
Draft Environmental Impact Study Report |
|
Sep 26, 2012 |
Environmental Effects Monitoring Report |
|
Sep 26, 2012 |
Draft Wind Turbine Specification Report |
|
Sep 26, 2012 |
Draft Telecom Impact Study Report |
|
Sep 26, 2012 |
Draft Noise Assessment Report |
|
Sep 26, 2012 |
Draft Design and Operations Report |
|
Sep 26, 2012 |
Appendix A |
|
Sep 26, 2012 |
Appendix B |
|
Sep 26, 2012 |
Appendix C |
|
Sep 26, 2012 |
Appendix D |
|
Sep 26, 2012 |
Appendix E |
|
Sep 26, 2012 |
Draft Decommissioning Plan Report |
|
Sep 26, 2012 |
Cultural Heritage Assessment Report |
|
Sep 26, 2012 |
Draft Construction Plan Report |
|
Sep 26, 2012 |
Archeological Assessment Report |
|
Apr 20, 2012 |
Draft Site Plan Report |
|
Apr 20, 2012 |
Draft Site Plan Report - Appendix A |
|
Apr 20, 2012 |
Draft Site Plan Report - Appendix B |
|
Apr 20, 2012 |
Draft Site Plan Report - Appendix C |
|
Apr 20, 2012 |
Wind Energy Study - Effect on Real Estate Values in the Municipality of Chatham-Kent, Ontario |
|
Apr 20, 2012 |
The Impact of Wind Power Projects on Residential Property Values in the US, Berkeley National Laboratory |
|
Apr 20, 2012 |
CanWEA Stray Voltage Fact Sheet |
|
Apr 20, 2012 |
CanWEA February Ontario Omnibus Survey Report |
|
Apr 20, 2012 |
Wind Energy Report: Views of Residents of PEI and Visitors to PEI, prepared by the Tourism Research Centre |
|
Apr 20, 2012 |
Behind the Switch - Pricing Ontario Electricty Options (July 2011) |
|
Apr 20, 2012 |
Article titled Ontario Couple loses wind turbines property tax case |
|
Apr 20, 2012 |
GWEC Global Wind Statistics 2011 |
|
Apr 17, 2012 |
Notice of Draft Site Plan |
|
Apr 2, 2012 |
CanWEA Fact Sheet - Introduction to Wind Power |
|
Apr 2, 2012 |
CanWEA Fact Sheet - Wind Technology |
|
Apr 2, 2012 |
CanWEA Fact Sheet - Wind Power is Reliable |
|
Apr 2, 2012 |
CanWEA Fact Sheet - Planning a Wind Farm |
|
Apr 2, 2012 |
CanWEA Fact Sheet - Environmental Benefits |
|
Apr 2, 2012 |
CanWEA Fact Sheet - Wildlife |
|
Apr 2, 2012 |
CanWEA Fact Sheet - Visual and Sound |
|
Apr 2, 2012 |
CanWEA Fact Sheet - Turbines and Land Use |
|
Apr 2, 2012 |
CanWEA Fact Sheet - The Wind Energy Industry |
|
Apr 2, 2012 |
CanWEA Fact Sheet - Building a Wind Farm |
|
Apr 2, 2012 |
CanWEA Fact Sheet - Consumer Benefits |
|
Apr 2, 2012 |
CanWEA Fact Sheet - Community Benefits |
|
Apr 2, 2012 |
CanWEA Fact Sheet - Economic Benefits |
|
Apr 2, 2012 |
CanWEA Fact Sheet - Health |
|
Apr 2, 2012 |
CanWEA Fact Sheet - Pricing |
|
Apr 2, 2012 |
CanWEA Fact Sheet - Property Values |
|
Apr 2, 2012 |
CanWEA Fact Sheet - Municipality Brochure |
|
Apr 2, 2012 |
Chief Medical Officer Report |
|
Apr 2, 2012 |
Wind Turbine Sound and Health Effects - An Expert Panel Review |
|
Apr 2, 2012 |
The Economic Impacts of the Wind Energy Sector in Ontario 2011-2018 |
|
Apr 2, 2012 |
Acoustic Consulting Report Prepared for the MOE - Wind Turbine Facilities and Noise Issues |
|
Apr 2, 2012 |
HGC Low Frequency Noise and Infrasound |
|
Mar 30, 2012 |
Public Information Centre |
|
Mar 30, 2012 |
FAQs for Public Information Centre |
|
Mar 30, 2012 |
Public Comment Sheet |
|
Feb 28, 2012 |
Notice of Proposal and Notice of Public Meeting |
|
Feb 9, 2012 |
Project Description Report |
|
REA Amendment Request
Date | Title | PDF |
Aug 23, 2021 |
REA Amend 3 – Blade Treatment Trials – 2021 |
|
Apr 12, 2017 |
REA Amend 2 Application |
|
Apr 12, 2017 |
REA Amend 2 Modification Document |
|
Apr 12, 2017 |
REA Amend 2 Noise Report |
|
Mar 24, 2015 |
REA Amendment 5186-9HBJXR |
|
Nov 7, 2014 |
REA Amend Application |
|
Nov 7, 2014 |
REA Amend Notice to Stakeholders |
|
Post-Construction Audits & Assessment Docs
Date | Title | PDF |
|
GB_Environmental_Bat Monitoring_Year6 2022 |
|
|
GB_Environmental_Bat Monitoring_Year5 2021 |
|
|
GB_Environmental_Bat Monitoring_Year4 2020 |
|
|
GB_Environmental_Bat/Bird Monitoring_Year3 2019 |
|
|
GB_Environmental_Bat/Bird Monitoring_Year2 2018 |
|
|
GB_Environmental_Disturbance_Monitoring_Year1 2017 |
|
|
GB_Environmental_Bat/Bird_Monitoring_Year1 2017 |
|
|
GB_MoE Ltr_Noise Audit_Cond E and F Rpts Acceptance |
|
|
GB_Noise Audit_HGC_Extra Info Ltr to MECP |
|
|
GB_Noise Audit_HGC_Facility Immissions Test1 |
|
|
GB_Noise Audit_HGC_Facility Immissions Test2 |
|
|
GB_Noise Audit_HGC_Substation Emissions |
|
|
GB_Noise Audit_HGC_Substation Immissions |
|
|
GB_Noise Audit_HGC_T05 Emissions |
|
|
GB_Noise Audit_HGC_T19 Emissions |
|
|
GB_Noise Audit_HGC_Turbine Emissions Cvr Rpt |
|
Maps
Date | Title | PDF |
|
McLean’s Mountain Wind Farm Project Map (as built) |
|
|
McLean's Mountain Wind Farm Project Map |
|
Community Liaison Committee
Date | Title | PDF |
Feb 19, 2015 |
CLC Meeting #4 - Nov 26 2014 - Mtg Minutes |
|
Feb 19, 2015 |
CLC Meeting #3 - May 21 2014 - Mtg Minutes |
|
Nov 3, 2014 |
Community Liaison Committee Meeting #4 Notice |
|
May 9, 2014 |
Community Liaison Committee Meeting #3 Notice |
|
May 9, 2014 |
CLC Draft Meeting #2 Minutes - Sep 18, 2013 |
|
Apr 29, 2013 |
CLC Meeting #1 – Mar 20, 2013 Draft Minutes |
|
Mar 18, 2013 |
CLC Terms of Reference |
|
Mar 18, 2013 |
Notice of CLC Meeting #1 |
|
Mar 18, 2013 |
CLC Meeting #1 Agenda |
|
Jan 25, 2013 |
Invitation to Join the CLC |
|
Environmental Review Tribunal Documents
REA Final Environmental Documents
Date | Title | PDF |
Nov 1, 2012 |
Renewable Energy Approval |
|
Sep 17, 2012 |
Cultural Heritage Assessment |
|
Sep 17, 2012 |
Environmental Effects Monitoring Plan (EEMP) - October 2012 |
|
Sep 17, 2012 |
Stage 2 Archeological Assessment, Part Lots 13-16, Concession 1; Part Lots 12-14, Concession 2 |
|
Sep 17, 2012 |
Stage 2 Archeological Assessment, Part Lots 12-165, Concession 3; Part Lot 24, Concession 12 |
|
Aug 15, 2012 |
Revised Final Noise Study Report |
|
Nov 24, 2011 |
Final Project Description Report |
|
Nov 24, 2011 |
Final Construction Plan Report |
|
Nov 24, 2011 |
GE Specification on Site Roads and Crane Pads |
|
Nov 24, 2011 |
Final Design and Operations Report - Section 1 |
|
Nov 24, 2011 |
Final Design and Operations Report - Section 2 |
|
Nov 24, 2011 |
GE Maintenance Checklist |
|
Nov 24, 2011 |
Final Decommissioning Plan Report |
|
Nov 24, 2011 |
Final Property Line Setback Report |
|
Nov 24, 2011 |
Final Wind Turbine Specification Report |
|
Nov 24, 2011 |
GE Specs – Technical Description and Data |
|
Nov 24, 2011 |
GE Acoustic Specifications |
|
Nov 24, 2011 |
Final Water Assessment Environmental Impact Statement |
|
Nov 24, 2011 |
Final Water Assessment Records Review Report |
|
Nov 24, 2011 |
Final Water Assessment Site Investigation - Section 1 |
|
Nov 24, 2011 |
Final Water Assessment Site Investigation - Section 2 |
|
Nov 24, 2011 |
Final Noise Study Report - Also available as Appendix B of the Design & Operations Report |
|
Nov 24, 2011 |
Final Consultation Report |
|
Nov 24, 2011 |
Final Consultation Report - Appendix A |
|
Nov 24, 2011 |
Final Consultation Report - Appendix B - Section 1 |
|
Nov 24, 2011 |
Final Consultation Report - Appendix B - Section 2 |
|
Nov 24, 2011 |
Final Consultation Report - Appendix C - Section 1 |
|
Nov 24, 2011 |
Final Consultation Report - Appendix C - Section 2 |
|
Nov 24, 2011 |
Final Consultation Report - Appendix C - Section 3 |
|
Nov 24, 2011 |
Final Consultation Report - Appendix C - Section 4 |
|
Nov 24, 2011 |
Final Consultation Report - Appendix D |
|
Nov 24, 2011 |
Final Consultation Report - Appendix E - Section 1 |
|
Nov 24, 2011 |
Final Consultation Report - Appendix E - Section 2 |
|
Nov 24, 2011 |
Final Consultation Report - Appendix E - Section 3 |
|
Nov 24, 2011 |
Final Consultation Report - Appendix E - Section 4 |
|
Sep 13, 2011 |
Environmental Impact Study |
|
Sep 13, 2011 |
Natural Heritage Records Review Report |
|
Sep 13, 2011 |
Site Investigation Report |
|
Sep 13, 2011 |
Site Investigation Report - Appendix A Supplementary Information |
|
Sep 13, 2011 |
Site Investigation Report - Appendix B CVs |
|
Sep 13, 2011 |
Site Investigation Report - Appendix C Weather Data and Field Notes - Section 1 |
|
Sep 13, 2011 |
Site Investigation Report - Appendix C Weather Data and Field Notes - Section 2 |
|
Sep 13, 2011 |
Site Investigation Report - Appendix C Weather Data and Field Notes - Section 3 |
|
Sep 13, 2011 |
Site Investigation Report - Appendix C Weather Data and Field Notes - Section 4 |
|
Sep 13, 2011 |
Site Investigation Report - Appendix C Weather Data and Field Notes - Section 5 |
|
Sep 13, 2011 |
Site Investigation Report - Appendix D Photographs |
|
Sep 13, 2011 |
Site Investigation Report - Appendix E Species |
|
Sep 13, 2011 |
Evaluation of Significance Report |
|
REA Amendment Docs - Final May 2013
Date | Title | PDF |
May 21, 2013 |
REA Amendment Approval |
|
May 21, 2013 |
REA Amendment Application Revised Noise Report May 3, 2013 |
|
Apr 24, 2013 |
REA Amend Notification Letter |
|
Apr 24, 2013 |
REA Amendment Application Mar 14/13 |
|
Apr 24, 2013 |
REA Amendment Application Mar 14/13 – Part 2 |
|
Apr 24, 2013 |
REA Amendment Application Revised Noise Report Apr 9/13 |
|
REA Amendment 2 Docs
Date | Title | PDF |
Oct 25, 2013 |
REA Amendment 2 – Approval |
|
Sep 13, 2013 |
REA Amendment 2 Notification Letter |
|
Sep 13, 2013 |
REA Amendment 2 Application Sept 11/13 |
|
OEB Leave to Construct
Date | Title | PDF |
Jul 31, 2012 |
Ontario Energy Board Leave to Construct Decision and Order |
|
Feb 17, 2012 |
EB-2011-0394 McLeans_cvr ltr_non-confidential material_20120217 |
|
Feb 17, 2012 |
EB-2011-0394 McLeans_Exhibit_E_Tab_1_Schedule_2_20120217 |
|
Feb 17, 2012 |
EB-2011-0394 McLeans_Exhibit_E_Tab_1_Schedule_3_20120217 |
|
Feb 17, 2012 |
EB-2011-0394 McLeans_Exhibit_E_Tab_1_Schedule_4_20120217 |
|
Feb 17, 2012 |
EB-2011-0394 McLeans_Exhibit_E_Tab_1_Schedule_5_20120217 |
|
Dec 22, 2011 |
Ontario Energy Board, Notice of Application and Hearing, Application for Leave to Construct Transmission Facilities for McLean’s Mountain Wind LP |
|
Dec 22, 2011 |
Ontario Energy Board, Application for Leave to Construct and Notice Under Section 81 of the Ontario Energy Board Act, 1998 |
|
Additional Environmental Reports
Date | Title | PDF |
Sep 17, 2012 |
Bird and Bat Environmental Effects Monitoring Plan |
|
Sep 17, 2012 |
Natural Heritage Environmental Effects Monitoring Plan |
|
Jan 17, 2010 |
McLean’s Mountain Wind Project – Renewable Energy Approval (REA) Draft Submission Package – Jan. 2010 |
|
Jan 17, 2010 |
REA – Submission Cover Letter |
|
Jan 17, 2010 |
REA – Section 1: Concordance Table |
|
Jan 17, 2010 |
REA – Section 2: The McLean’s Mountain Wind Farm ESR/EIS July 2009 Comment/Response Table |
|
Jan 17, 2010 |
REA – Section 3: Supplementary REA Reports |
|
Jan 17, 2010 |
REA – Section 4: Supplementary Mapping |
|
Jul 23, 2009 |
McLean’s Mountain Wind Farm – ESR – July ’09 |
|
Jul 23, 2009 |
Appendix A: Turbine Coordinates |
|
Jul 23, 2009 |
Appendix B: Stakeholder Consultation Report |
|
Jul 23, 2009 |
Appendix C: Natural Environment Report |
|
Jul 23, 2009 |
Appendix D: Bird Study Report |
|
Jul 23, 2009 |
Appendix E: Bat Study Report |
|
Jul 23, 2009 |
Appendix F: Archaeology Report |
|
Jul 23, 2009 |
Appendix G: Noise Analysis Report |
|
Jul 23, 2009 |
Appendix H: Visual Assessment Report |
|
Jul 23, 2009 |
Appendix I: Shadow Flicker Report |
|
Jul 23, 2009 |
Appendix J: Aboriginal Consultation Summary |
|
REA Amendment 3 Docs
Date | Title | PDF |
|
MMWF_MOE_REA Amendment Apply3 |
|
Post-Construction Audits & Assessment Docs
Date | Title | PDF |
|
MMWF_REA_Acoustic Audit Condition E Immissions_Spring_July 2018 |
|
|
MMWF_Noise E-Audit Cond F_T16 IEC 61400-11 Ed3.0 |
|
|
MMWF_Noise E-Audit Cond F_T15 IEC 61400-11 Ed3.0 |
|
|
MMWF_Noise E-Audit Cond F_T05 IEC 61400-11 Ed3.0 |
|
|
MMWF_Noise E-Audit Cond F_Resubmission Cover Ltr |
|
|
MMWF_REA_Acoustic Audit Condition G_NO20 2014 |
|
|
MMWF_REA_Acoustic Audit Condition E Immissions_Fall_Rev1_Sept 2015 |
|
Documents
Date | Title | PDF |
Dec 17, 2020 |
High Bridge December Newsletter |
|
Dec 7, 2020 |
High Bridge Community Sponsorship List |
|
Aug 20, 2020 |
High Bridge Wind Public Disclosure List |
|
Aug 20, 2020 |
Code of Conduct - High Bridge Wind Farm |
|
Jun 26, 2018 |
Public Involvement Program Plan |
|
Final Scoping Statement (FSS)
Date | Title | PDF |
Jul 1, 2019 |
High Bridge Wind Farm Final Scoping Statement |
|
Jun 20, 2019 |
Appendices for the High Bridge Final Scoping Statement |
|
Jan 23, 2019 |
Figures for High Bridge Final Scoping Statement |
|
Perliminary Scoping Statement (PSS)
Date | Title | PDF |
Mar 21, 2019 |
High Bridge Response to Comments on PSS |
|
Jan 24, 2019 |
High Bridge PSS Cover Letter |
|
Jan 23, 2019 |
High Bridge PSS Figures |
|
Jan 1, 2019 |
High Bridge PSS |
|
Dec 13, 2018 |
High Bridge PSS Appendices |
|
Notices
Date | Title | PDF |
Feb 14, 2019 |
Ruling Extending PSS Comment Deadline and Comment Response Deadline |
|
Feb 14, 2019 |
Request for Extension of PSS Comment Deadline |
|
Feb 8, 2019 |
Notice of Intervenor Funding and Comment Deadlines |
|
Dec 18, 2018 |
Updated Notice of PSS Submission |
|
Nov 16, 2018 |
Notice of Submission of Preliminary Scoping Statement |
|
Article 10 Application
Date | Title | PDF |
Aug 12, 2019 |
Application Table of Contents |
|
Aug 12, 2019 |
Exhibits 1-3 |
|
Aug 12, 2019 |
Exhibit 4, Part 1 |
|
Aug 12, 2019 |
Exhibit 4, Part 2 |
|
Aug 12, 2019 |
Exhibit 4, Part 3 |
|
Aug 12, 2019 |
Exhibit 4, Part 4 |
|
Aug 12, 2019 |
Exhibits 5-10 |
|
Aug 12, 2019 |
Exhibit 11, Part 1 |
|
Aug 12, 2019 |
Exhibit 11, Part 2 |
|
Aug 12, 2019 |
Exhibits 12-14 |
|
Aug 12, 2019 |
Exhibits 15-18 |
|
Aug 12, 2019 |
Exhibit 19, Part 1 |
|
Aug 12, 2019 |
Exhibit 19, Part 2 |
|
Aug 12, 2019 |
Exhibit 20, Part 1 |
|
Aug 12, 2019 |
Exhibit 20, Part 2 |
|
Aug 12, 2019 |
Exhibit 20, Part 3 |
|
Aug 12, 2019 |
Exhibit 21, Part 1 |
|
Aug 12, 2019 |
Exhibit 21, Part 2 |
|
Aug 12, 2019 |
Exhibit 22, Part 1 |
|
Aug 12, 2019 |
Exhibit 22, Part 2 |
|
Aug 12, 2019 |
Exhibit 22, Part 3 |
|
Aug 12, 2019 |
Exhibit 22, Part 4 |
|
Aug 12, 2019 |
Exhibit 23 |
|
Aug 12, 2019 |
Exhibit 24, Part 1 |
|
Aug 12, 2019 |
Exhibit 24, Part 2 |
|
Aug 12, 2019 |
Exhibits 25-31 |
|
Aug 12, 2019 |
Exhibits 32-41 |
|
Public Documents
Date | Title | PDF |
Sept. 1, 2022 |
Complaint Resolution Plan Operational |
|
Sept. 1, 2022 |
Updated Contact Information Notice Bluestone |
|
Aug. 9, 2022 |
Disclosure List for Bluestone Wind, LLC |
|
June 1, 2022 |
Bluestone Breezy Bulletin - June 2022 |
|
Feb. 28, 2022 |
Bluestone Breezy Bulletin - February 2022 |
|
Sept. 29, 2021 |
Disclosure List for Bluestone Wind, LLC |
|
June 2, 2021 |
Bluestone Breezy Bulletin - June 2021 |
|
Jan. 1, 2021 |
Pre-Construction Notice |
|
Jan. 1, 2021 |
Emergency Action Plan for Tree Clearing |
|
Dec. 31, 2020 |
Complaint Resolution Plan |
|
Dec. 18, 2020 |
CPCN Order |
|
Aug. 20, 2020 |
New York Code of Conduct |
|
Dec. 16, 2019 |
Article 10 Certificate |
|
Oct. 4, 2018 |
Bluestone Surveys Press Release |
|
Sept. 7, 2018 |
Bluestone Application Notice with Map |
|
Aug. 18, 2017 |
Preliminary Scoping Statement |
|
Dec. 1, 2016 |
Public Involvement Program Plan |
|
Bluestone Application Files
Appendixes
Date | Title | PDF |
Mar. 2016 |
Appendix A-J |
|
July 2018 |
Appendix K part 1 |
|
July 2018 |
Appendix K part 2 |
|
July 2018 |
Appendix K part 3 |
|
Aug. 2018 |
Appendix L-W |
|
Sept. 7, 2018 |
Appendix X |
|
Aug. 2018 |
Appendix Y-DD |
|
June 2018 |
Appendix EE |
|
Sept. 2018 |
Appendix FF-JJ |
|
Aug. 2018 |
Appendix KK part 1 |
|
Oct. 2017 |
Appendix KK part 2 |
|
Sept. 2018 |
Appendix LL-OO |
|
Mar. 2018 |
Appendix PP-UU |
|
Sept. 2018 |
Appendix VV part 1 |
|
2018? |
Appendix VV part 2 |
|
Aug. 31, 2018 |
Appendix VV part 3 |
|
Sept. 14, 2018 |
Appendix WW-YY |
|
Sept. 2018 |
Appendix ZZ part 1 |
|
Sept. 8, 2018 |
Appendix ZZ part 2 |
|
Mar. 2018 |
Appendix ZZ part 3 |
|
Jan. 18, 2018 |
Appendix ZZ part 4 |
|
Mar. 2015 |
Appendix ZZ part 5 |
|
July 2018 |
Appendix AAA-FFF |
|
May 4, 2018 |
Appendix GGG-MMM |
|
Nov. 1, 2013 |
Appendix NNN part 1 |
|
Aug. 29, 2018 |
Appendix OOO-PPP |
|
Exhibits
Date | Title | PDF |
Sept. 6, 2018 |
Exhibits 1-3 |
|
Sept. 17, 2018 |
Exhibits 4-10 |
|
Sept. 17, 20 |
Exhibits 11-20 |
|
Sept. 17, 2020 |
Exhibit 21 |
|
Sept. 17, 2018 |
Exhibits 22-27 |
|
Sept. 17, 2018 |
Exhibits 28-30 |
|
Spring 2018 |
Exhibits 31-40 |
|
Project Info
Date | Title | PDF |
Apr. 21, 2022 |
Ball Hill Full Updated Disclosure List |
|
Oct. 1, 2020 |
Ball Hill - New York Code of Conduct |
|
Oct. 30, 2019 |
Villenova Ball Hill SEQRA Findings |
|
2019 |
Resolution of the Town Board of the Town of Villenova Adopting Local Law No. 2 of 2019 |
|
Oct. 30, 2019 |
Resolution of the Town Board of the Town of Villenova Adopting Local Law No. 3 of 2019 |
|
Oct. 4. 2019 |
Ball Hill SFEIS |
|
Aug. 13, 2019 |
Supplemental DEIS |
|
Appendices A-G
Date | Title | PDF |
June 2018 |
Appendix A -FEAF Final |
|
June 2018 |
Appendix B Visual Resource Assessment – Santoga Ball Hill Technical Memorandum June 2018 |
|
Oct. 23, 2017 |
Appendix C Noise Assessment 0 Layout 092617 Sound Study Memo |
|
May 22, 2018 |
Appendix D – FAA Determinations |
|
Mar. 7, 2019 |
Appendix E – Communications Signals Correspondence |
|
July 23, 2018 |
Appendix F Cultural Resource Correspondence – Bonafide Letter 7.23.18 |
|
May 29, 2018 |
Appendix F Cultural Resource Correspondence – Herter Achaeo No Effects letter |
|
July 18, 2018 |
Appendix G – Property Values Correspondence 2018 IREM Letter Ball Hill Wind Energy Project |
|
Appendices H.1-H
Appendices I-O
Date | Title | PDF |
Oct. 2018 |
Appendix I Wetlands Mitigation Plan |
|
June 2019 |
Appendix J – Decommissioning Plan |
|
Nov. 15, 2018 |
Appendix K – Energy Net Conservation Benefit Plan |
|
May 2017 |
Appendix L - Eagle Surveys 2016-2017 |
|
June 17, 2019 |
Appendix M – Cultural resources Mitigation Plan |
|
Sept. 2019 |
Appendix N – BBCS 2019 |
|
Sept. 4, 2019 |
Appendix O – Public Comment and Response Log |
|
Remaining General Project Info
Date | Title | PDF |
Oct. 20, 2019 |
Villenova Town Board 2019 SFEIS |
|
May 10, 2019 |
Ball Hill MOA |
|
July 18, 2018 |
Letter to CCPB |
|
June 26, 2018 |
Response to Comments and Questions raised at Villenova Public Hearing June 26 |
|
2018 |
Impacts Summary |
|
July 2018 |
Pages from 2018_2016 Simulation Comparisons |
|
June 27, 2018 |
Hanover Packet from 6.25.18 meeting |
|
June 13, 2018 |
RES Ball Hill Final – Villenova 2018 Application |
|
Final Environmental Impact Statement - Full
Date | Title | PDF |
Nov. 2016 |
Final Environmental Impact Statement – Volume 1 |
|
Nov. 2016 |
Final Environmental Impact statement – Volume 2 |
|
Final Environmental Impact Statement - SPlit (ENB-Appendix H)
Date | Title | PDF |
Nov. 22, 2016 |
ENB Notice FEIS |
|
Nov. 2016 |
FEIS Text and Figures |
|
Nov. 21, 2016 |
Appendix A – Updated Tables and Figures |
|
Nov. 21, 2016 |
Appendix B – Turbine Specifications |
|
Nov. 22, 2016 |
Appendix C – Project Drawings |
|
Nov. 22, 2016 |
Appendix D – Material Safety Data Sheets |
|
Nov. 21, 2016 |
Appendix E pt 1 – Water Quality and Wetlands |
|
May 24, 2016 |
Appendix E pt 2 – Water Quality and Wetlands |
|
Nov. 21, 2016 |
Appendix F – Conceptual Wetland Mitigation Plan |
|
Nov. 21, 2016 |
Appendix G – Agency Correspondence |
|
Nov. 2016 |
Appendix H – Bird and Bat resources |
|
SPLIT documents continued (Appendices I-T)
Date | Title | PDF |
Nov. 21, 2016 |
Appendix I – Visual Resource Assessment |
|
Nov. 21, 2016 |
Appendix J – Sound Level Assessment Report |
|
Nov. 21, 2016 |
Appendix K – Communication Surveys |
|
Nov 21, 2016 |
Appendix L – Complaint Resolution Plan |
|
Nov. 21, 2016 |
Appendix M - Transportation |
|
Nov. 21, 2016 |
Appendix N – Cultural Resource Surveys |
|
Nov. 21, 2016 |
Appendix O – Architectural Resources Mitigation |
|
Nov. 21, 2016 |
Appendix P – Health and Safety Plans |
|
Nov. 21, 2016 |
Appendix Q – Property Valuation Study |
|
Nov. 21, 2016 |
Appendix R – Decommissioning Plan |
|
Nov. 21, 2016 |
Appendix S – Environmental Monitoring Plan |
|
Nov. 22, 2016 |
Appendix T – Public Participation |
|
Town or Villernova - FULL + SPLIT
Date | Title | PDF |
Oct. 13, 2016 |
Notice of Villenova Public Hearing |
|
2007 |
Villenova Wind Law |
|
2019 |
SEQRA Findings |
|
Sept. 19, 2016 |
Villenova Amended Application |
|
Sept. 28, 2016 |
Ball Hill Wind Energy, LLC Amended Application for Special Use Permit and Wind Overlay District – Town of Villenova |
|
2015 |
Appendix A: Vestas 126, 3.45 MW Series Wind Turbine Brochure |
|
Apr. 8, 2016 |
Appendix B – Memoranda of Lease |
|
Dec. 4, 2015 |
Appendix C: FAA Advisory Circular 70/7460-1 L, Obstruction Marking and Lighting |
|
Aug. 11, 2016 |
Appendix D: FAA Determinations of No Hazard to Air Navigation |
|
None |
Appendix E: Agricultural Data Statement |
|
Feb. 16, 2014 |
Appendix F: 2008 Environmental Assessment Form and 2015 Board Resolution |
|
Mar. 24, 2016 |
Appendix G: Material Safety Data Sheets |
|
July 5, 2016 |
Appendix H: Ball Hill Wind Project, Final Visual Resource Assessment |
|
Sept. 12, 2016 |
Appendix I: Working Draft Emergency Response Plan |
|
Oct. 4, 2016 |
Appendix J: Sound Level Assessment Report, Ball Hill Wind Project |
|
July 22, 2016 |
Appendix K: Real Estate Consulting Report of Influence of Wind Farms on Residential Real Estate Values, Proposed Ball Hill Wind Energy Project |
|
Town of Hanover
Date | Title | PDF |
Oct. 6, 2016 |
Hanover Amended Application |
|
None |
Hanover Wind Law |
|
Nov. 9, 2016 |
Notice of Hanover Public Hearing |
|
Oct. 6, 2016 |
Hanover Amended Application Full |
|
2015 |
Appendix A - Vestas |
|
May 18, 2016 |
Appendix B – Memoranda of Lease |
|
None |
Appendix C – Agricultural Data Statement |
|
Feb. 16, 2014 |
Appendix D: 2008 Environmental Assessment Form and Town of Villenova 2015 Board Resolution |
|
July 5, 2016 |
Appendix E – Final Visual Resource Assessment |
|
Dec. 4, 2015 |
Appendix F: FAA Advisory Circular |
|
Aug. 11, 2016 |
Appendix G: FAA Determinations of No Hazard to Air Navigation |
|
Oct. 4, 2016 |
Appendix H – Sound Level Assessment Report |
|
Supplemental Draft Environmental Impact Statement ( Until Appendix G)
Date | Title | PDF |
Jan. 2016 |
Ball Hill SDEIS |
|
Sept. 2008 |
Noble Ball Hill DEIS vol. I |
|
Sept 2008 |
Noble Ball Hill DEIS vol. II |
|
Sept. 2008 |
Noble Ball Hill DEIS vol. III |
|
Nov. 23, 2015 |
Appendix B – Project Layout |
|
Nov. 23, 2015 |
Appendix C – Draft Progress Wetland Delineation Report |
|
Dec. 11, 2015 |
Appendix D – Preliminary Transportation Site Survey |
|
Jan. 2016 |
Appendix E – stormwater pollution prevention measures |
|
Jan. 18, 2016 |
Appendix F – Draft EMP and ISMP |
|
2015 |
Appendix G – Health and Safety |
|
SDEIS Continued
Date | Title | PDF |
Jan. 2016 |
Appendix I – Drain Repair |
|
Jan. 2016 |
Appendix J – Conceptual Wetland Mitigation Measures |
|
Aug. 2011 |
Appendix K – Bird Surveys |
|
Feb. 2013 |
Appendix L – Bat Surveys |
|
Dec. 28, 2015 |
Appendix M – Visual Resource Assessment |
|
2008? |
Appendix N – Decommissioning Plan |
|
Dec. 22, 2015 |
Appendix O – Sound Level Assessment Report |
|
Nov. 16, 2012 |
Appendix P – Communication Surveys |
|
2015 |
Appendix Q – agency Correspondence |
|
May 19, 2015 |
Appendix R – Obstruction Evaluation Analysis |
|
May 2013 |
Appendix S – Cultural Resource Surveys |
|
Efficient Natural Gas
Ont. Regulation 116/01 – Environmental Screening
Date | Title | PDF |
|
EA Screening - Notice of Commencement |
|
|
|
|